2025 results · engineering data
The link in figures
All figures come from the annual report of the Øresundsbro Konsortiet and from the technical data of the structure.
Crossings per year, in millions
2015 and 2020 rounded as reported by the consortium; 2023 and 2024 carried forward, 2025 exactly 8,003,000. To be re-checked with every new annual report.

Structure
| Total length | 16 km |
| Cable-stayed bridge | 7.85 km |
| Main span | 490 m |
| Pylon height | 203.5 m |
| Drogden Tunnel | 4.05 km |
| Peberholm | 4 km artificial island |
| Opening | 1 July 2000 |
| Operator | Øresundsbro Konsortiet (DK/SE, 50/50) |
Traffic 2025
| Total crossings | 8,003,000 |
| Daily average | 21,925 vehicles (+5.5 %) |
| Lorries over 9 m | 605,900 passages (record) |
| Electric vehicles | around 1,440,000 (+45 %) |
| Electric share of traffic | approx. 18 % |
| Car commuting | +9.8 % (Jan–Sep) |
| Road revenue | 1,861 million DKK |
| Result before value adjustment | 1,736 million DKK |